-
A Yes. We accept customization for: modified geometry, alternative materials, performance upgrades, and branding. Required inputs: technical drawing (STEP, DWG, or PDF with dimensions), sample (if available), and specifications. Lead time: 2–4 weeks depending on complexity. MOQ typically 500–1,000 units.
-
A Standard package: (1) technical drawing in STEP or DWG format with all dimensions and tolerances, (2) materials and coating specification, (3) sample (if modifying existing part), (4) quantity and timeline requirements, (5) any performance/test requirements. E-mail to [email].
-
A Depends on the modification scope: (1) Minor changes (hole repositioning, thickness adjustment): no tooling required, cost impact ~5–10%, lead time +1 week. (2) Major changes (geometry redesign, new material): new tooling required, cost +$500–$5,000 (depends on part complexity), lead time +3–4 weeks.
-
A Typical lead times: 2–3 weeks for sample/prototype approval, 4–6 weeks for production tooling (if needed), 2–4 weeks for production batch (depending on MOQ: 500–5,000 units). Total: 6–14 weeks from order to shipment. Expedite options available at 10–15% surcharge.
-
A Yes. Full branding support: (1) custom packaging with your logo/brand, (2) custom labels and product nameplates, (3) instruction manuals in your language, (4) QR codes for tracking/warranty. MOQ for custom packaging: 2,000–5,000 units. Timeline: add 1–2 weeks.
-
A Yes. We sign bilateral NDAs to protect customer intellectual property. NDA term typically 3–5 years. Please provide your NDA template or we will use our standard template. Processing time: 3–5 business days.